【24h】

UNCLASSIFIED EXCAVATION

机译:未分类的挖掘

获取原文
获取外文期刊封面目录资料

摘要

A.Section Includes: 1.Excavate areas as shown on the Drawings or as directed.Removal of materials encountered to the lines, grades, and typical sections shown on the Drawings and removal from site.Excavations may include construction of a.Roadways b.Drainage Channels c.Site Excavation d.Excavation for Structures e.Or any other operation involving the excavation of on-site materials B.Deviations from this City of Fort Worth Standard Specification 1.1.2.2 Excavation by Surveyed Quantity deleted.C. Related Specification Sections include, but are not necessarily limited to:1. Division 0 - Bidding Requirements, Contract Forms and Conditions of the Contract2. Division 1 - General Requirements3. Section 31 23 23 - Borrow4. Section 31 24 00 - Embankments
机译:A.搜索包括:1.拔除区域,如图所示或根据指示。遇到的材料遇到的材料,等级和典型部分,以及从Site.excavations删除的典型部分可能包括A.罗达道的构造。排水通道C. Site挖掘D.Excavation用于结构E.Oor涉及开挖现场材料的任何其他操作B.Deviations来自该城市的堡垒标准规范1.1.2.2通过调查量删除了挖掘。相关规范部分包括但不一定限于:1.第0次 - 招标要求,合同的合同形式和条件2.第1段 - 一般要求3.第31章23 23 - 借款4.第31章24 00 - 堤防

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号