首页> 外文会议>Fusion Engineering 2005, Twenty-First IEEE/NPS Symposium on >Revision and adaptation of the reference design HV bushing to SINGAP configuration
【24h】

Revision and adaptation of the reference design HV bushing to SINGAP configuration

机译:修改参考设计HV套管并将其调整为SINGAP配置

获取原文

摘要

The 1 MV bushing of the ITER neutral beam (NB) injector is a HV feedthrough for all the electrical bus bars and the water cooling pipes of the ion source and of the accelerator. It acts also as a barrier between the SF6 insulated HV line and the ITER primary vacuum. Two different accelerators have been considered for the ITER NB injector, namely the multiaperture multigrid (MAMuG) concept, which is now the reference design, and the single aperture single gap concept (SINGAP) as an alternative design. In this work the bushing reference design has been revised and adapted to the SINGAP option. The new design has been optimised by means of detailed electrostatic analyses. Mechanical analyses have been also carried out to assess the design of the bushing under the new loads in SINGAP configuration
机译:ITER中性束(NB)进样器的1 MV套管是HV馈通,用于离子源和加速器的所有电气母线以及水冷管。它也是SF 6 绝缘高压线和ITER初级真空之间的屏障。对于ITER NB喷射器,已经考虑了两种不同的加速器,即现在作为参考设计的多孔径多栅格(MAMuG)概念和作为替代设计的单孔单间隙概念(SINGAP)。在这项工作中,套管参考设计已经过修改,并适应了SINGAP选件。新设计已通过详细的静电分析进行了优化。还进行了机械分析,以评估在SINGAP配置下新载荷下的衬套设计

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号