RECENT EPA AIR MEMORANDA AND POLICY CHANGES

机译:近期EPA航空备忘录和政策变更

获取原文

摘要

1. EPA may object to a proposed Title V permit -EPA has 45 days from receipt of proposed permit, 40 CFR 70.8(c) -Any person may petition EPA within 60 days of expiration of EPA's 45 days, 40 CFR 70.8(d) EPA must object "if petitioner demonstrates ... that the permit is not in compliance with the requirements" of CAA, 42 USCA 766id(b)(2) -Widely used by NGOs/EPA to 'override' state decisions and review prior preconstruction permit decisions 2. PacifiCorp Energy, October 16, 2017 (82 Fed. Reg. 58196, Dec. n, 2017) -Title V permitting process is not the appropriate forum to review prior preconstruction permitting decisions -Incorporate terms and conditions of final preconstruction permit as "applicable requirements" without further review of whether those conditions were properly derived or whether a different type of permit was required for the same construction activity EPA will limit its review to whether the Title V permit: -Has accurately incorporated "applicable requirements" and -Includes adequate monitoring, recordkeeping, and reporting requirements to assure compliance with the terms and conditions of the preconstruction permit Will not review prior PSD Program decisions that are incorporated into a Title V permit.
机译:1. EPA可以反对拟议的V头许可证-EPA在收到拟议的许可证后45天之内(CFR 70.8(c))-任何人都可以在EPA的45天40 CFR 70.8(d)届满之日起60天内上访EPA EPA必须反对CAA,42 USCA 766id(b)(2)的“如果请愿人证明...许可不符合要求”-非政府组织/ EPA广泛用于“推翻”国家决策并审查事先的预先构造许可决定2. PacifiCorp Energy,2017年10月16日(82 Fed。Reg。58196,2017年12月n日)-标题V的许可过程不是审查先前施工前许可决定的合适论坛-包含最终施工前许可的条款和条件作为“适用要求”,而无需进一步审查这些条件是否正确得出或同一建筑活动是否需要不同类型的许可证EPA将其审查限于标题V的许可:-是否已正确纳入“适用要求”和-一世包括足够的监视,记录保存和报告要求,以确保符合施工前许可证的条款和条件。将不会审查纳入V头许可证中的PSD程序之前的决定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号