首页> 外文会议>Association of State Dam Safety Officials annual conference >Continuity of Risk Informed Decision Making from Design Through Construction for the Isabella Lake Dam Safety Project
【24h】

Continuity of Risk Informed Decision Making from Design Through Construction for the Isabella Lake Dam Safety Project

机译:伊莎贝拉湖大坝安全项目从设计到施工的风险知情决策的连续性

获取原文

摘要

Dam Safety modifications to the Isabella Auxiliary Dam are currently under construction to address actionable potential failure modes. Isabella Lake is located on the Kern River 34 miles upstream of the City of Bakersfield in Kern County, California. Isabella Dam has been designated as a Dam Safety Action Class (DSAC) I project by the U.S. Army Corps of Engineers (USACE), requiring action to reduce probabilities of failure and associated consequences. Isabella Dam construction began in 1948 and was completed in 1953, and consists of two embankment dams that provide flood control, water supply, power generation and recreation benefits to the region. The modifications under construction are addressing actionable potential failure modes identified over three primary areas of deficiency, including hydrologic overtopping, internal erosion of the foundation and seismic instability from strong ground motion/fault rupture. This paper includes a summary of the potential risk and dam safety modifications under construction. This paper focuses on the importance and challenges of maintaining focus on Potential Failure Modes (PFM's) and risk informed decision making through design and in to construction. The paper also discusses the approach to maintain continuity as the project transitioned between the Dam Safety Modification Study (DSMS), Preconstruction Engineering and Design (PED), and construction/implementation for successful completion of the Post Implementation Evaluation (PIE).
机译:对Isabella辅助大坝的大坝安全修改目前正在建设中以解决可操作的潜在故障模式。 Isabella湖位于加利福尼亚州肯尼亚州埃克斯菲尔德市的凯恩河34英里上游。伊莎贝拉大坝被美国工程师(USACE)的大坝安全动作课(DSAC)I项目被指定为大坝安全行动级(DSAC),要求采取行动降低失败和相关后果的概率。 Isabella大坝建设始于1948年,并于1953年完成,由两座堤坝组成,为该地区提供防洪,供水,发电和娱乐益处。正在建设的修改正在解决可操作的潜在故障模式,确定了三个主要缺陷领域,包括水文概述,基础的内部侵蚀和来自强大的地面运动/故障破裂的地震不稳定。本文包括正在建设中潜在风险和大坝安全修改的摘要。本文侧重于维持潜在故障模式(PFM)的重要性和挑战,并通过设计和建设进行风险的风险。本文还讨论了保持连续性的方法,因为该项目在大坝安全修改研究(DSMS),预设工程和设计(PED)之间转型,以及成功完成后实施评估(饼)的建设/实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号