The Karlsruhe Monster-Highly Flexible Steel Formwork, Operated Under Hyperbaric Conditions: Design and Application of a High-Tech Formwork in a Tapered Tunnel Section

机译:在高压条件下运行的卡尔斯鲁厄怪物高柔性钢模板:锥形隧道段中高科技模板的设计和应用

获取原文

摘要

Connecting two stations of the new Light rail scheme in the heart of Karlsruhe, Germany the Kaiser-Friedrich-Tunnel had to be excavated and finally lined under compressed air conditions. An extreme widening of the tunnel on the last 40 meters made the inner lining works special with regard to both the selection and erection of the formwork as well as the construction of the lining. The nearly 200 ton formwork was erected and operated inside the pressurized tunnel, all works were performed in a 24/7 operation at up to 1.15 bar (17 psi) air pressure. The paper describes the challenges faced in connection with these unusual conditions.
机译:连接德国卡尔斯鲁厄市中心新轻轨计划的两个车站,必须挖掘Kaiser-Friedrich-Tunnel,最后在压缩空气条件下衬砌。在最后的40米处,隧道的极度拓宽使内衬的工作在模板的选择和架设以及衬砌的建造方面都很特别。将近200吨的模板架设在加压隧道内并进行操作,所有工作均在24/7的操作压力下进行,最高压力为1.15 bar(17 psi)。本文描述了与这些异常条件相关的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号