Balancing Prescription and Innovation through Design-Build of a Major Recycled Water Conveyance Project

机译:通过大型循环水输送项目的设计建造平衡处方和创新

获取原文
获取外文期刊封面目录资料

摘要

The city of Modesto's North Valley Regional Recycled Water Program is one of the largest water recycling projects in the country, constructing a 32 million gallons per day (121,100 cubic meters per day), 3,000-horsepower (2,200 kW) pump station, 7 mi (11.2 km) of 42-in (1.06 m) diameter pipeline with a 2,800-ft (0.9 km) horizontal directional drill, a jack and bore highway crossing, and an outfall structure to the federally owned Delta Mendota Canal. Funding this major project came with aggressive schedule requirements. To meet these requirements, Modesto chose a new approach: design-build. Using this approach, Modesto was able to finish the project a year faster compared to traditional design-bid-build. This paper describes Modesto's approach to leveraging the benefits of design-build while including requirements important to Modesto. It describes the design-build procurement process, from developing a procurement strategy to implementing a two-stage selection process, and ultimately selecting a design-builder. The paper also discusses the lessons learned, such as the need to involve the design-build team early on and to balance cost and non-cost evaluation criteria. Finally, it discusses the project's successes and failures and makes specific recommendations to avoid potential pitfalls while harnessing the benefits of design-build. The project was deemed substantially complete in December 2017.
机译:莫德斯托市的北谷地区循环水计划是该国最大的水循环项目之一,每天建造3200万加仑(每天121,100立方米),3,000马力(2,200千瓦)的泵站,7英里( 11.2公里)的直径为42英寸(1.06 m)的管道,具有2,800英尺(0.9 km)的水平定向钻机,千斤顶和高速公路横穿通道以及通往联邦政府拥有的门多塔运河的出水口结构。为这个重大项目提供资金时,需要严格的时间表。为了满足这些要求,莫德斯托选择了一种新方法:设计-建造。与传统的设计竞标构建相比,使用这种方法,Modesto能够更快地完成该项目。本文介绍了Modesto利用设计构建优势的方法,同时包括了对Modesto重要的要求。它描述了设计-构建采购过程,从制定采购策略到实施两阶段选择过程,最后选择设计-构建者。本文还讨论了所吸取的教训,例如需要尽早让设计构建团队参与进来,并平衡成本和非成本评估标准。最后,它讨论了该项目的成败,并提出了具体建议,以避免在利用设计构建的好处的同时避免潜在的陷阱。该项目于2017年12月被认为已基本完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号