Well Design and Well Workover to Land Deep Production Casings in the Menengai Field

机译:在Menengai油田进行深井开采套管的井设计和修井

获取原文

摘要

Drilling has been on going at Menengai high temperature field since 2011. The wells are regular well design wells with the 20" surface casing set at 60-70m. 13 3/8" anchor casing set at about 400m depth and the 9 5/8" production casing set at between 800-1400m. The wells are targeted to be drilled to a total depth of 2500-3000m, with the slotted 7" liners run to the bottom. All the casings used are grade K55 with threaded couplings. Data from offset wells drilled earlier have helped design the depth of the production casing to avoid cold inflows into the wells. Wells located at the center of the field which are at a higher elevation have the production casings set at about 850m, while wells sited further away, the production casing has been designed to be set further deeper, to up to 1400m. A majority of the wells at the Menengai field have the production casing set at 1400m. This paper looks at designing wells with 9 5/8" K55 production casing, slurry design and the most effective method for cementing the casing to ensure an effective cement job. Cementing methods that will be discussed include cementing head and plugs, two stage cementing, C-Flex RPL from peak using the inner string method, reverse circulation cementing with inner string and flap gate valve collar and use of foam cementing. The paper looks at a number of wells which have already been completed. Pressure and temperature logs of the wells are analyzed as well as the borehole geology to identify the cold inflow zones. The remedial mechanisms available for sealing off the cold zones in completed wells are then researched and the most effective method to be applied at the Menengai field identified. The methods include use of External casing packer (ECP) and tie back design.
机译:自2011年以来,一直在Menengai高温领域进行钻井。这些井是常规井设计井,其中20“地表套管设置为60-70m。13 3/8”锚定套管设置在大约400m的深度,而9 5/8 “生产套管定在800-1400m之间。目标是钻探总深度为2500-3000m的井,开槽的7英寸衬管钻到底。所有使用的套管均为带螺纹接头的K55级。来自较早钻探的偏移井的数据有助于设计生产套管的深度,从而避免冷流入井中。位于油田中心的较高海拔的井将生产套管定为约850m,而将井设置在较远的位置,则将生产套管设计为更深,可达1400m。 Menengai油田的大多数井的生产套管定为1400m。本文着眼于设计使用9 5/8“ K55生产套管的井,泥浆设计以及最有效的固井方法,以确保有效的固井作业。将讨论的固井方法包括固井头和旋塞,两阶段固井, C-Flex RPL使用内管柱法从峰值开始,使用内管柱和活门闸阀套环进行反向循环固井,并使用泡沫固井,本文着眼于已完工的许多井,井的压力和温度记录进行分析并确定井眼地质,以确定冷流入区,然后研究可用于封堵完井中冷区的补救机制,并确定在Menengai油田应用的最有效方法,这些方法包括使用外部包装封隔器(ECP)和扎带设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号