首页> 外文会议>IEEE PES Asia-Pacific Power and Energy Engineering Conference >A data-mining-based system design for cost management and control of power transmission and transformation project
【24h】

A data-mining-based system design for cost management and control of power transmission and transformation project

机译:基于数据挖掘的输变电工程造价管理系统设计

获取原文

摘要

Monitoring, managing and controlling the cost of a power transmission and transformation project (PTTP) plays an essential role in meeting the growing power demand and achieving the sustainable power project construction development. A model of cost management and control system for PTTP on the basis of the data mining theory is addressed. Seven tiers are designed to collect cost information, compile and store data, analyze the project costs and correct their deviations. These tiers specifically generate topology diagrams between all the factors giving rise to a fluctuation of the cost, analyze the correlation of factors, predict the cost, and raise several deviation-corrected proposals to users. A 110kV substation project is employed to demonstrate the proposed approach, in terms of the data deduction in three periods, including the budgetary estimation (BE), settlement and post evaluation. This system demonstration consists of price forecast by means of the well-established back-propagation neural network, price fluctuation tracking and cost analysis.
机译:监视,管理和控制输变电项目(PTTP)的成本在满足不断增长的电力需求和实现可持续的电力项目建设发展中起着至关重要的作用。提出了一种基于数据挖掘理论的PTTP成本管理与控制系统模型。七层旨在收集成本信息,编译和存储数据,分析项目成本并纠正其偏差。这些层专门在引起成本波动的所有因素之间生成拓扑图,分析因素的相关性,预测成本,并向用户提出一些偏差校正的建议。一个110kV变电站项目被用来演示该方法,包括三个阶段的数据推算,包括预算估算(BE),结算和后期评估。该系统演示包括通过完善的反向传播神经网络进行价格预测,价格波动跟踪和成本分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号