Former Manufactured Gas Plant (MGP) production from circa 1860s through the 1950s at a site in Norwich, New York, resulted in impacts to both on-site and off-site soils and groundwater. Site remediation includes four phases of treatment: in situ solidification (ISS) of on-site source materials; recovery of NAPL from off-site; in-situ chemical oxidation (ISCO) of off-site areas; and enhanced bioremediation of off-site groundwater. Approximately 52,103 cubic yards (39,835 cubic meters) of impacted sand and gravel were solidified in-situ using auger mixing technology, and over 54,000 gallons (210,000 liters) of NAPL have been recovered to date. An ISCO bench-scale study revealed that four applications of hydrogen peroxide will reduce BTEX and naphthalene by 99% and TPH by 50%. Full-scale ISCO application will occur upon completion of NAPL recovery, followed by enhanced bioremediation of dissolved phase contamination (benzene and naphthalene).
机译:从约1860年代到1950年代,在纽约诺里奇的某个地点生产的前制造煤气厂(MGP)对现场和非现场土壤及地下水都产生了影响。现场修复包括四个阶段的处理:现场原始材料的原位固化(ISS);以及现场修复。从场外回收NAPL;场外区域的原位化学氧化(ISCO);以及加强非现场地下水的生物修复。使用螺旋钻混合技术原位固化了约52103立方码(39835立方米)的受冲击的沙子和碎石,迄今为止已回收了54,000加仑(210,000升)的NAPL。 ISCO基准规模研究表明,过氧化氢的四次施用将使BTEX和萘减少99%,TPH减少50%。在NAPL回收完成后,将进行ISCO的全面应用,然后对溶解相污染物(苯和萘)进行生物修复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号