A Novel Approach on Project Performance Monitoring and Overrun Probability Measurement Using Statistical Process Control Techniques

机译:利用统计过程控制技术进行项目绩效监测和超支概率测量的新方法

获取原文

摘要

The earned value management (EVM) is a tool commonly used to monitor both cost and schedule performance, based on the current status of a project. However, EVM does not consider the variation rate of project performance during project execution phase, which may oscillate, causing unexpected time and cost overruns or even project failure at the end. In this research, a methodology for monitoring project time and cost adverse variation rate, by the use of statistical process control (SPC), is introduced. This methodology improves the previous investigations in this field by considering overall required conditions and circumstances. Process capability indices of SPC, as a very powerful tool for analyzing variability of a process in comparison with its limitations, have the potential to be used as a risk management tool for projects. A novel model is also developed to predict project time and cost overruns probability using process capability indices of SPC. This will enable the project manager to determine the project failure probability, in terms of time and cost overruns, and to take corrective actions in order to avoid such failure in advance.
机译:挣值管理(EVM)是一种通常用于根据项目的当前状态监视成本和进度绩效的工具。但是,EVM不考虑项目执行阶段中项目性能的变化率,波动率可能会波动,从而导致意外的时间和成本超支,甚至最终导致项目失败。在这项研究中,介绍了一种通过使用统计过程控制(SPC)来监视项目时间和成本不利变化率的方法。通过考虑整体所需条件和情况,该方法改进了该领域以前的研究。 SPC的过程能力指数,作为分析过程可变性及其局限性的一种非常强大的工具,有潜力用作项目的风险管理工具。还开发了一种新颖的模型,以使用SPC的过程能力指标来预测项目时间和成本超支的可能性。这将使项目经理能够根据时间和成本超支确定项目失败的可能性,并采取纠正措施,从而提前避免此类失败。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号