首页> 外文会议>ASME Pressure Vessels and Piping Division/K-PVP conference;PVP2010 >DROP TESTS RESULTS OF REVISED CLOSURE BOLT CONFIGURATION OF THE STANDARD WASTE BOX, STANDARD LARGE BOX-2, AND TEN DRUM OVERPACK PACKAGINGS
【24h】

DROP TESTS RESULTS OF REVISED CLOSURE BOLT CONFIGURATION OF THE STANDARD WASTE BOX, STANDARD LARGE BOX-2, AND TEN DRUM OVERPACK PACKAGINGS

机译:标准废物箱,标准大型箱2和十个滚筒超大包装的封闭式螺栓配置修改后的落差测试结果

获取原文

摘要

The Transuranic (TRU) Disposition Project at Savannah River Site will require numerous transfers of radioactive materials within the site boundaries for sorting and repackaging. The three DOT Type A shipping packagings planned for this work have numerous bolts for securing the lids to the body of the packagings. In an effort to reduce operator time to open and close the packages during onsite transfers, thus reducing personnel exposure and costs, an evaluation was performed to analyze the effects of reducing the number of bolts required to secure the lid to the packaging body. The evaluation showed the reduction to one-third of the original number of bolts had no affect on the packagings' capability to sustain vibratory loads, shipping loads, internal pressure loads, and the loads resulting from a 4-ft drop. However, the loads caused by the 4-ft drop are difficult to estimate and the study recommended each of the packages be dropped to show the actual effects on the package closure. Even with reduced bolting, the packagings were still required to meet the 49 CFR 178.350 performance criteria for Type A packaging.
机译:萨凡纳河厂区的超铀(TRU)处置项目将需要在厂区边界内大量转移放射性物质,以进行分类和重新包装。计划用于此工作的三个DOT A型运输包装具有许多螺栓,用于将盖子固定到包装主体上。为了减少现场转移期间操作人员打开和关闭包装的时间,从而减少人员的暴露和成本,进行了评估以分析减少将盖子固定到包装主体所需的螺栓数量的影响。评估显示,螺栓数量减少到原始数量的三分之一对包装承受振动载荷,运输载荷,内部压力载荷以及4英尺下降引起的载荷的能力没有影响。但是,由于难以估计4英尺高的落差所引起的载荷,因此研究建议将每个包装都放下以显示对包装闭合的实际影响。即使减少了螺栓连接,仍要求包装符合A型包装的49 CFR 178.350性能标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号