首页> 外文会议>2010 International Conference on Mechanic Automation and Control Engineering >Analysis of dry dock slope stability at different construction stages
【24h】

Analysis of dry dock slope stability at different construction stages

机译:不同施工阶段的干坞边坡稳定性分析

获取原文

摘要

Through constructing to refilling the dry dock for the tunnel cross Haihe River in Tianjin Binhai New Area, the slope of the dock will be undergoing three stages, i.e., excavation, water filling and water draining, respectively. The stability of the dry dock slope is studied by using Fellenius method of slices and Bishop simplified method. At the excavation stage, the soil disturbance is considered; at the water filling stage, the capillarity suction lost above the phreatic line is considered; and at the water draining stage, the slope surface is assumed to be the phreatic line, the sudden falling of the water level is considered and the effective stress method is used. The research result has been adopted as the theoretical basis for the design of the project.
机译:通过构建在天津滨海新区隧道跨海河隧道隧道的干船坞,码头的斜坡将分别进行三个阶段,即挖掘,水灌装和水排水。通过使用切片和主教简化方法的谷胱带方法研究了干码头斜率的稳定性。在挖掘阶段,考虑了土壤干扰;在水灌装阶段,考虑潜水线上方损失的毛细血管吸力;并且在水排放阶段,假设斜面是潜水线,考虑水位的突然下降,使用有效的应力方法。研究结果已被采用作为项目设计的理论依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号