首页> 外文会议>China International Conference on Electricity Distribution >Research on regional grid power dispatch and control strategy based on grid wind power integration capacity
【24h】

Research on regional grid power dispatch and control strategy based on grid wind power integration capacity

机译:基于网格风力集成容量的区域网格电力调度与控制策略研究

获取原文

摘要

With the rapid development of large-scale wind power in our country, it has some negative effects on the safe operation of regional grid, especially when the low-peak load regulation capacity is insufficient, which can cause serious wind abandonment phenomenon and affects wind power's scale. There is a way to get the regional grid power integration capacity on an operating section considering limits of grid peak-load regulation capacity. Then the wind turbines are able to be added to the regional grid dispatch and source schedule in one day. By researching one traditional optimization model of regional grid dispatch and control strategy, this paper provides a new multi time-scale operation control method considering grid winder power integration capacity and economized the abandoned wind power. This paper also proved the new strategy is effective by an example which showed the new dispatch and control strategy could improve the access capacity of wind power and reduce the operating costs.
机译:随着大规模风电在我国的快速发展,其对区域电网的安全运行,特别是在低调峰能力不足,这可能会导致严重的风遗弃的现象一定的负面影响,影响风电的规模。考虑到电网峰值调节容量的限制,有一种方法可以在操作部分获得区域网格电力集成容量。然后,风力涡轮机能够在一天内添加到区域网格调度和源时间表。通过研究区域网格调度和控制策略的传统优化模型,本文提供了一种新的多时间尺度操作控制方法,考虑网格络筒机电力集成容量,节约废弃的风力。本文还证明,新的策略是有效的,一个例子显示了新的调度和控制策略可以提高风力的访问能力并降低运营成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号