RAPID CONSTRUCTION TECHNOLOGY FOR TOWER BELT CONVEYOR PLACEMENT AT THE II-STAGE OF THE THREE GORGES PROJECT

机译:三峡工程II阶段塔带式输送机仓位快速施工技术

获取原文

摘要

The II-phase construction of Three Gorges Project (hereinafter shorted as TGP) featured in numerous placements and tight schedule. It is the dam blocks at the main-bed of Yangtze that is the most difficult part of the construction and controls the total -project duration. Subjected to the above restriction, it is the Tower Belt Conveyors that played a major role in placing concrete. It is unprecedented that large-scale application of the Tower Belt Conveyors and its feeding-line machines were used to place concrete to the main body at the Hydroelectricity Construction in the world, which brought forward some challenges for the traditional construction. In order to adapt to high-intensity and high-speed placement of the Tower Belt Conveyors, some innovation and breakthrough on the construction management and technology etc. in the second phase of construction of TGP have been put forward. This paper summed up some problems in placing concrete by Tower Belt Conveyors and their corresponding solutions and measures, and made out the brief summarization for the rapid placement technology for the Tower Belt Conveyors at the same time.
机译:三峡工程的II相建设(以下简称为TGP)在众多展示和紧张的时间表中。是长江主床上的大坝块,这是施工中最困难的一部分,并控制总持续时间。经受上述限制,它是塔式带式输送机,在放置混凝土时发挥了重要作用。它前所未有的是,塔式带式输送机及其馈电线机的大规模应用用于将混凝土放置在世界的水电建设中的主体上,为传统建筑带来了一些挑战。为了适应塔式带式输送机的高强度和高速放置,提出了TGP建设第二阶段的施工管理和技术等的一些创新和突破。本文总结了塔式带式输送机混凝土及其相应的解决方案和措施中的一些问题,并同时为塔式带式输送机进行了快速放置技术的简要摘要。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号