For the resource constrained project scheduling problem (RCPSP) we introduce a notion of stored resources. Like it is for renewable resources, a predetermined number of units of a stored resource is available for every unit period of the planning horizon. But if some quantity of the resource is not utilized in period t, it can be utilized in any subsequent period t'展开▼