首页> 外文会议>Offshore technology conference;OTC 2000 >Completion of Large-Bore High Pressure/High Temperature Wells: Design and Experience
【24h】

Completion of Large-Bore High Pressure/High Temperature Wells: Design and Experience

机译:大口径高温高压井完井设计与经验

获取原文

摘要

The completion of High Temperature High Pressure (HTHP) gas condensate wells has historically been limited to techniques that are considered sub-optimal when compared to techniques used on lower pressure and temperature wells. These limits have been driven by the extreme nature of the wellbore conditions and the resultant high stresses and difficult operating conditions placed on well bore equipment.
机译:从历史上讲,高温高压(HTHP)气体凝析油井的完井仅限于与低压井和低温井上使用的技术相比被认为次优的技术。这些限制是由井筒条件的极端性质以及在井筒设备上放置的高应力和困难的操作条件所驱动的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号