An Effective Approach to Delay Analysis When Schedule Updates are Missing

机译:缺少计划更新时有效的延迟分析方法

获取原文
获取外文期刊封面目录资料

摘要

Most contracts require periodic schedule updates; however, sometimes contractors fail to provide these updates. This could be for a variety of reasons; perhaps concealing delays because recovery is anticipated, loss of scheduling staff, or due to a high workload. However, missing schedule updates make it much harder to isolate, identify, and analyze delays that occur during those update periods, as well as dramatically increasing risk to both the contractor and the owner. This paper provides guidance to an owner that will facilitate a collaborative and effective analysis of delays, and resolution of time extension entitlements. This proven approach is aligned with AACE International Recommended Practice No. 29R-03, "Forensic Schedule Analysis", and ensures that the analysis will not create any pitfalls at a later date should the issues require more formal dispute resolution. This process has been successfully implemented on multiple projects, and this paper includes a case study of a similar problem that was resolved for the Massachusetts Department of Transportation (MassDOT).
机译:大多数合同要求定期更新时间表;但是,有时承包商无法提供这些更新。这可能有多种原因。可能是由于预期的恢复,调度人员的损失或工作量大而掩盖了延迟。但是,缺少时间表更新会使得隔离,识别和分析在这些更新期间发生的延迟变得更加困难,并且极大地增加了承包商和业主的风险。本文为所有者提供了指导,该所有者将有助于对延迟进行协作和有效的分析,并解决延长时间的权利。这种行之有效的方法与AACE国际建议惯例29R-03“法医进度分析”保持一致,并确保如果问题需要更正式的争议解决,则该分析不会在以后产生任何陷阱。此过程已在多个项目上成功实施,并且本文包括对马萨诸塞州交通运输部(MassDOT)解决的类似问题的案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号