首页> 外文会议>International pipeline conference >COMPLIANCE OVERSIGHT OF OPERATORS' INTEGRITY MANAGEMENT PROGRAM FOR PIPELINES - A RISK BASED EVALUATION APPROACH INCORPORATING SAFETY CULTURE
【24h】

COMPLIANCE OVERSIGHT OF OPERATORS' INTEGRITY MANAGEMENT PROGRAM FOR PIPELINES - A RISK BASED EVALUATION APPROACH INCORPORATING SAFETY CULTURE

机译:管道运营商完整性管理程序的合规性监督-结合安全文化的基于风险的评估方法

获取原文

摘要

Integrity Management Program (IMP) is a systematic and documented program for assuring asset integrity throughout the full life cycle of an asset. To ensure safe and reliable operation, the British Columbia Oil and Gas Commission (Commission) has been requiring its licensed pipeline operators through its regulations to develop and implement pipeline integrity management programs (IMPs) in accordance with Canadian Industry Standard CSA Z662. The auditing process, the collated results and findings from the IMP audit years (2011-15) were published in IPC 2016-64161[1]. Since 2016, the Commission has enhanced its IMP compliance assurance process, and aligned it with the management system approach using Deming's model of plan-do-check-act (PDCA) for IMP components and incorporated a lifecycle approach that spans the entire lifecycle of a pipeline system from planning to abandonment. In addition, the Commission has adopted a multi-criteria decision-making approach when prioritizing which operators to audit. This method utilizes weighted rank approach and takes into account multiple factors, such as, previous IMP audit results, pipeline length and product, class location, incident frequency, and asset age. Through collaborative efforts with the University of British Columbia (Okanagan), an innovative risk based audit tool -Integrity Management Program Audit and Knowledge Tool (IMPAKT) has been developed to help evaluate the compliance of operators' IMP in terms of the management system approach and its associated risk. This tool conducts three-dimensional analysis of IMP performance using the failure mode effect analysis (FMEA) technique and allows the Commission to generate a risk profile for each IMP component to determine which components are most critical, requiring immediate attention. The final audit results are presented as a Risk Priority Number (RPN), which is a product of severity, occurrence and action. An effective integrity management program requires a strong safety culture, therefore, safety culture aspects are incorporated into the risk based auditing tool, IMPAKT. This risk based evaluation process also allows the Commission to develop a compliance benchmark to make comparison between different operators' IMP results for continuous performance improvement. This paper presents the innovative approach developed and implemented by the Commission for the IMP compliance oversight (auditing) process and implication of such changes.
机译:完整性管理程序(IMP)是一个系统化的文件化程序,可确保资产在整个生命周期内的完整性。为了确保安全可靠的运行,不列颠哥伦比亚省石油和天然气委员会(委员会)一直要求其许可的管道运营商通过其法规,以根据加拿大行业标准CSA Z662制定和实施管道完整性管理程序(IMP)。 IPC 2016-64161 [1]中发布​​了审核过程,IMP审核年度(2011-15年)的核对结果和调查结果。自2016年以来,委员会加强了其IMP遵从性保证流程,并使用Deming针对IMP组件的计划-执行-检查-行动(PDCA)模型使其与管理系统方法保持一致,并纳入了涵盖整个产品生命周期的生命周期方法。从计划到废弃的管道系统。此外,委员会在确定要审核的运营商的优先级时采用了多标准决策方法。该方法利用加权等级方法,并考虑了多个因素,例如以前的IMP审核结果,管道长度和产品,班级位置,事故发生频率和资产使用年限。通过与不列颠哥伦比亚大学(Okanagan)的合作,开发了基于风险的创新审计工具-完整性管理计划审计和知识工具(IMPAKT),以帮助评估运营商IMP在管理系统方法和法规方面的合规性。其相关的风险。该工具使用故障模式影响分析(FMEA)技术对IMP性能进行了三维分析,并使委员会能够为每个IMP组件生成风险概况,以确定哪些组件最关键,需要立即引起注意。最终审核结果以风险优先级编号(RPN)的形式表示,该编号是严重性,发生情况和操作的乘积。有效的完整性管理程序需要强大的安全文化,因此,将安全文化方面纳入基于风险的审计工具IMPAKT中。这种基于风险的评估过程还使委员会能够制定合规性基准,以比较不同运营商的IMP结果,从而持续改进性能。本文介绍了委员会针对IMP遵从性监督(审核)流程开发和实施的创新方法,以及这种更改的含义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号