Limit Capacity Calculation of PV Generation System Based on Distribution Grid Operational Scenarios

机译:基于配电网运行场景的光伏发电系统极限容量计算

获取原文

摘要

It is a challenge for the distribution grid with more and more PV generation connected. The limit capacity calculation of PV generation is the key for the problems of distribution grid. The paper proposes method for the calculation of limit capacity of PV generation in the distribution grid. The proposed model takes the maximum capacity of PV generation as the objective, and the operation constraints contain bus voltage deviation, line current, main transformer limit, reactive power compensation and power turning. Fish swarm algorithm is used for the calculation of the limit capacity of PV generation. The simulation of IEEE33 bus system shows that the proposed method can increase the grid-connected limit capacity of PV generation under the premise of meeting the constraints of distribution grid system. It verifies the rationality and feasibility of the proposed method, and provides a solution for the limit capacity of distributed PV generation connected into distribution grid.
机译:对于连接越来越多的光伏发电的配电网而言,这是一个挑战。光伏发电的极限容量计算是配电网问题的关键。提出了配电网光伏发电极限容量的计算方法。该模型以光伏发电的最大容量为目标,运行约束包括母线电压偏差,线电流,主变压器极限,无功补偿和功率转向。鱼群算法用于计算光伏发电的极限容量。对IEEE33总线系统的仿真表明,该方法可以在满足配电网系统约束的前提下,提高光伏发电的并网极限容量。验证了所提方法的合理性和可行性,并为接入配电网的分布式光伏发电的极限容量提供了解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号