首页> 外文会议>International Universities Power Engineering Conference >Combined heat power plant connection into urban distribution network according to least cost technically acceptable principle
【24h】

Combined heat power plant connection into urban distribution network according to least cost technically acceptable principle

机译:按照成本最低的技术可接受原则将热力发电厂连接到城市配电网络

获取原文
获取外文期刊封面目录资料

摘要

The aim of this paper is to give insight in the Combined Heat and Power (CHP) plant connection method into the Urban Distribution Network (UDN) based on Least Cost Technically Acceptable (LCTA) principle and impact of the most dominant UDN technical, operational and economic constraints that influence the connection method. There is no general agreement regarding the practice concerning the optimal allocation of financial responsibility for the CHP plant connection cost in the UDN. The differences in policies for the connection charges are substantial. They reflect the fact that different connection principles and policies consideration, each reasonable and valid, lead to different conclusion. The main goal of the planning process is to ensure that the UDN is developed in an orderly and cost effective way; Urban Distribution Network planner (UDNP) and Urban Distribution Network Operator (UDNO) must ensure that there is sufficient UDN capacity is available to meet new loads and CHP system connection as they arise, and to meet on-going growth and requirements. They also need to ensure that new connections are completed as technically/economically acceptable and able to meet the possible future needs of the customer/prosumers. UDNO is obliged to provide the CHP system developer with connection under acceptable standards as detailed in the UDN Distributed Code. If higher standard or higher security of CHP generation connection is required it can be provided at the CHP system developer's request, however the full additional costs will be assign to the developer. In order to complete the CHP system connection into the UDN according to the LCTA principle the following sensitivity analysis of technical constraints are necessary to be performed as part of the connection process and these include: Equipment ratings, Protection settings, Voltage profile and Network losses. Based on the results obtained from these sensitivity analysis the UDNP/UDNO will determine a connection- method which complies with the UDN appropriate standards and planning criteria.
机译:本文的目的是基于最小成本技术可接受(LCTA)原则以及最主要的UDN技术,运营和运营影响,深入了解热电联产(CHP)工厂连接方法进入城市配电网(UDN)的方法。影响连接方法的经济限制。关于UDN中CHP工厂连接成本的财务责任的最佳分配的惯例,尚无普遍协议。连接费用的政策差异很大。它们反映了这样一个事实,即不同的连接原则和策略考虑(每个合理和有效)会得出不同的结论。计划过程的主要目标是确保以有序且具有成本效益的方式开发UDN;城市配电网规划师(UDNP)和城市配电网运营商(UDNO)必须确保有足够的UDN容量来满足新负载和CHP系统连接的出现,并满足持续的增长和要求。他们还需要确保新连接在技术上/经济上可以接受并且能够满足客户/生产者未来可能的需求。 UDNO有义务按照可接受的标准(如UDN分布式代码中所述)为CHP系统开发人员提供连接。如果需要更高标准或更高安全性的CHP生成连接,可以在CHP系统开发人员的要求下提供它,但是全部额外费用将分配给开发人员。为了根据LCTA原理完成CHP系统到UDN的连接,作为连接过程的一部分,必须对技术限制进行以下敏感性分析,这些敏感性分析包括:设备额定值,保护设置,电压曲线和网络损耗。根据从这些敏感性分析中获得的结果,UDNP / UDNO将确定一种符合UDN适当标准和规划标准的连接方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号