首页> 外文会议>International Symposium on Operations Research and its Applications in Engineering, Technology and Management >Replacement first and last for a parallel system with constant and random units
【24h】

Replacement first and last for a parallel system with constant and random units

机译:对于具有恒定和随机单位的并行系统,首先要更换,最后要更换

获取原文

摘要

This paper observes optimal replacement times for a parallel system with n units, when it is operating for successive jobs with a random working cycle. The classical approach of “whichever occurs first” and the newly proposed approach of “whichever occurs last” are respectively employed for replacements scheduled at time T and at working cycle Y , whose policies are called replacement first and replacement last. Two cases when the number of units for this parallel system is a given constant value and a random variable with estimated distribution are considered into modelings. We obtain their expected replacement cost rates and optimal solutions analytically. Further, comparisons of replacement first and replacement last are described in detail to determine which policy could save more replacement cost rate.
机译:本文针对具有n个单元的并行系统,当其以连续的工作周期运行于连续作业时,观察到最佳的更换时间。在时间T和工作周期Y计划的替换分别采用经典的“先发生”和“最后发生”的新方法,其策略分别称为“先发生替换”和“最后发生替换”。建模时考虑了两种情况,其中该并行系统的单位数量是给定的常数,并且随机变量具有估计的分布。通过分析,我们可以获得他们的预期重置成本率和最佳解决方案。此外,详细描述了“先更换”和“后更换”的比较,以确定哪种策略可以节省更多的更换成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号