首页> 外文会议>Association for the Advancement of Cost Engineering;AACE International annual meeting >Adapting Alternative Dispute Resolution to Meet the Demands of Modern Projects
【24h】

Adapting Alternative Dispute Resolution to Meet the Demands of Modern Projects

机译:调整替代性纠纷解决方案以满足现代项目的需求

获取原文

摘要

Complexity and uncertainty have become hallmarks of modern constructionprojects. Over the past two decades, our industry has experienced rapid changes that havefundamentally transformed the industry. Advances in technology and innovation have changedthe way projects are planned, constructed, and monitored. Speed to the market has become apremium. Shrinking budgets and alternative delivery methods have presented uniquechallenges and caused a realignment of project partners, with a marked shift away from thetraditional design-bid-build model. And we are still suffering from a global recession, the worstin 80 years.The rapid rate of change and new alignments of project participants have placed a premium onefficient, timely dispute resolution. Our paper will examine commonly-used ADR (AlternativeDispute Resolution) methods (e.g., mediation, arbitration, DRBs, project neutrals) and discusshow these mechanisms can be adapted to meet the needs of modern projects. Gone are thedays when parties can simply reserve rights and fight later. Rather, the authors will suggestways in which participants can incorporate efficient, effective dispute resolution techniquesinto their projects.
机译:复杂性和不确定性已成为现代建筑的标志 项目。在过去的二十年中,我们的行业经历了快速变化, 从根本上改变了行业。技术和创新的进步已经改变 项目的计划,构建和监视方式。加快上市速度已成为 优质的。不断缩减的预算和替代的交付方式带来了独特的效果 挑战并导致了项目合作伙伴的重组,与 传统的设计竞标构建模型。而且我们仍在遭受全球衰退的打击,这是最严重的 在80年内 快速的变化速度和项目参与者的新契合使 高效,及时的争议解决。我们的论文将研究常用的ADR(替代 争议解决)方法(例如,调解,仲裁,DRB,项目中立)和讨论 如何调整这些机制以满足现代项目的需求。去了 各方可以简单地保留权利并稍后进行战斗的日子。相反,作者会建议 参与者可以采用有效,有效的争议解决技术的方式 进入他们的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号