首页> 外文会议>International Conference and Exhibition on Electricity Distribution >Challenges in the distribution grid development regime for DG integration — The need for predictable plans and arenas for communication
【24h】

Challenges in the distribution grid development regime for DG integration — The need for predictable plans and arenas for communication

机译:DG集成的分发网格开发制度挑战 - 可预测计划和竞争的必要性

获取原文

摘要

In Norway, distribution companies experience that the grid regulatory regime, has not developed in line with the pressure stemming from the growth of distributed generation (DG). This paper presents two major nontechnical challenges for the distribution companies. Firstly, the lack of incentives to ensure a holistic planning of the grid, and secondly, the communication challenge between the DG owner and the Distribution System Operator (DSO) in terms of information flow and dialogue through the process. Several initiatives have been taken to meet these challenges. However, the problems are still present. The paper seeks to address the existing plans in Norway for DG integration of small scale hydro power and grid development and assesses whether better use and coordination of regional and local plans can reduce the uncertainty faced by the DSOs through providing a more predictable picture of the DG development process for the actors involved.
机译:在挪威,配送公司经历电网监管制度,尚未符合来自分布式发电(DG)的生长的压力。本文为分销公司提出了两个主要的无国卫生挑战。首先,缺乏激励措施来确保网格的整体规划,其次,在信息流程和对话通过过程中,DG所有者和分配系统运营商(DSO)之间的沟通挑战。已经采取了若干举措来满足这些挑战。但是,问题仍然存在。本文旨在解决挪威现有计划,为小规模水电和电网开发的DG整合,并评估区域和地方计划的更好使用和协调是否可以通过提供更可预测的DG图片来减少DG的不确定性参与者的开发过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号