首页> 外文会议>International Conference on Information, Intelligence, Systems and Applications >Simulation and optimization for ship lock scheduling: A case study
【24h】

Simulation and optimization for ship lock scheduling: A case study

机译:船舶锁定调度模拟与优化 - 以案例研究

获取原文
获取外文期刊封面目录资料

摘要

The influence of infrastructural modifications on port and waterway locks to the lock system's capacity cannot be estimated accurately. This paper introduces a simulation model and optimization approach to ship lock scheduling capable of simulating the effects of infrastructural changes upon traffic handling at a ship lock with parallel chambers. Simulation parameters are determined via an analysis of historical data. The model is ascertained via a simulation of the current operations at the lock. The effect of infrastructural changes upon traffic handling may then be accurately assessed via new simulations. The downtimes of lock chambers due to canal drainage requirements, for example, represent a particularly interesting element of the simulation's input. Optimization of traffic handling in the new infrastructural environment is consequently performed to increase the ship lock's throughput and decrease passage times for ships. Results demonstrate the huge influence drainage policy has upon passage times, how optimizing the process results in greatly improved lock traffic handling and finally how it is in lock proprietors' best interest to seriously consider alternatives for chamber drainage downtimes.
机译:在端口和水路锁到锁定系统的容量基建修改的影响不能被精确地估计。本文介绍了一种仿真模型和优化方法,以船能够模拟的交通时基建变化在船闸具有平行腔室处理的影响的锁调度。仿真参数经由历史数据的分析来确定。该模型是通过在锁定一个模拟当前操作的确定。的基于业务处理基础设施的改变的效果可能随后经由新仿真准确地评估。的锁定室由于管排水要求的停机时间,例如,代表了模拟的输入的一个特别有趣的元件。因此被执行交通在新的基础设施环境中处理的优化,以提高船闸的通过量和减少经过时间的舰艇。结果证明了巨大的影响排水策略具有在经过时间,如何在优化大大提高了锁业务处理过程的结果,最终它是如何在锁业主的最佳利益,认真考虑排水室停机时间的替代品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号