首页> 外文会议>IWHIR 2011;International Workshop on High-Speed and Intercity Railways >The Problem and Strategy on Subsidence Assessment of Construction Projects under Ballastless Track in Chinese High-Speed Railway
【24h】

The Problem and Strategy on Subsidence Assessment of Construction Projects under Ballastless Track in Chinese High-Speed Railway

机译:中国高速铁路无Ball轨道下建设项目沉陷评估的问题与对策

获取原文

摘要

The subsidence assessment of construction projects under track is very important for laying ballastless track for high-speed railway. The method how to obtain the measurement of the subsidence is introduced in details. And then, the discussion on the usability and scientificity of the relevant subsidence assessment method is carried on. The problem and weakness about the assessment is analyzed and demonstrated. According to the analysis and demonstration, the improved assessment is put forward here. Also, the effective and simple method to obtain the subsidence measurement is suggested. The reliability and accuracy of the measurement and the assessment is emphasised. At last, the assessment results are demonstrated in order to explain the improvement, basing on the examples of subsidence assessment about Chinese high-speed railway in ballastless track.
机译:轨道下建设项目的沉陷评估对于铺设高速铁路无ball轨道非常重要。详细介绍了如何获得沉降测量值的方法。然后,讨论了有关沉陷评估方法的实用性和科学性。分析并论证了评估的问题和不足。根据分析和论证,本文提出了改进的评估方法。此外,提出了一种有效而简单的方法来获得沉降测量值。强调了测量和评估的可靠性和准确性。最后,以中国高铁无ball轨道沉陷评估为例,对评估结果进行了论证,以说明其改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号