首页> 外文会议>The Third International Joint Conference on Computational Science and Optimization >Pricing the Cost of Dredging Engineering Based on the Dynamic Game
【24h】

Pricing the Cost of Dredging Engineering Based on the Dynamic Game

机译:基于动态博弈的疏Engineering工程造价定价

获取原文
获取外文期刊封面目录资料

摘要

The asymmetric and incomplete information of dredging engineering make it difficult to price the cost of dredging engineering. The paper using the game theory in pricing the cost of dredging engineering, establish the pricing model of the cost of dredging engineering based on static and dynamic game, and find the pricing model of the cost of dredging engineering based on the dynamic game is better than static game and the valuation model of bill of quantity(BOQ)
机译:疏engineering工程的信息不对称且不完整,因此难以对疏engineering工程的成本进行定价。本文运用博弈论对疏engineering工程造价进行定价,建立了基于静态和动态博弈的疏engineering工程造价定价模型,发现基于动态博弈的疏engineering工程造价定价模型优于静态博弈和工程量清单计价模型

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号