首页> 外文会议>Second International Conference on Engineering Systems Management and Its Applications >Comparison of final costs and undervalues between reverse and forward engineering products
【24h】

Comparison of final costs and undervalues between reverse and forward engineering products

机译:反向工程和正向工程产品之间的最终成本和价值低估比较

获取原文

摘要

Production economy and profitability depend on the quality of engineering design and manufacturing process planning. Product design and development take in a large sum of total expenditures including professional manpower, computer-aided modelling, simulation of experiments; and prototyping. It also involves customer demand analysis and market research in advance, which extend the pre-investment studies and add to total costs. In reverse engineering, the design phase is limited to identification the existing product using a backward recognition mechanism that can considerably affect the final cost of the products. In this paper, the elements of cost are compared between forward and reverse engineering and the differences are discussed. In addition, the deviations between actual and predicted costs are investigated for a few cases. Finally, the internal and external factors for these estimation errors are classified and the corrections are suggested.
机译:生产的经济性和盈利能力取决于工程设计和制造过程计划的质量。产品设计和开发需要大量的总支出,包括专业人力,计算机辅助建模,实验模拟;和原型。它还预先涉及客户需求分析和市场研究,从而扩展了投资前研究并增加了总成本。在逆向工程中,设计阶段仅限于使用向后识别机制来识别现有产品,该机制会大大影响产品的最终成本。本文比较了正向工程和反向工程之间的成本要素,并讨论了差异。此外,还研究了少数情况下实际成本和预测成本之间的差异。最后,对这些估计误差的内部和外部因素进行了分类,并提出了更正建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号