首页> 外文会议>Annual technical conference of the North American Society for Trenchless Technology 2008 >CONSTRUCTION INSPECTOR TRAINING REQUIREMENTS FOR TRENCHLESS PIPELINE RENEWAL PROJECTS
【24h】

CONSTRUCTION INSPECTOR TRAINING REQUIREMENTS FOR TRENCHLESS PIPELINE RENEWAL PROJECTS

机译:管道更新项目的施工检查人员培训要求

获取原文

摘要

The Trenchless pipeline renewal industry has grown, over the last 25-30 years, with the launching of numerous new technologies. Trenchless renewal however, is exponentially more complicated than the traditional excavate, remove the old pipe and replace with a new pipe approach. Considering that these technologies are more complicated, a very common approach for accepting trenchless construction is "if it looks good it must be installed correctly". This of course is inadequate and good quality inspection during construction is needed. This paper will look at the inspection requirements of other industries and what inspection requirements are necessary for the trenchless pipe renewal industry.
机译:在过去的25到30年间,随着众多新技术的推出,无沟槽管道更新行业得到了发展。但是,无沟槽更新比传统的挖掘要复杂得多,拆除旧管道并用新管道替换。考虑到这些技术更为复杂,因此接受非开挖构造的一种非常普遍的方法是“如果看起来不错,则必须正确安装”。当然这是不充分的,需要在施工期间进行良好的质量检查。本文将探讨其他行业的检查要求,以及非开挖管道更新行业需要哪些检查要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号