Managing Complex Environmental Remediation amidst Aggressive Facility Revitalization Milestones

机译:在积极的设施复兴里程碑中管理复杂的环境修复

获取原文

摘要

Unlike the final closure projects at Rocky Flats and Fernald, many of the Department of Energy's future CERCLA and RCRA closure challenges will take place at active facilities, such as the Oak Ridge National Laboratory (ORNL) central campus. ORNL has aggressive growth plans for a Research Technology Park and cleanup must address and integrate D&D, soil and groundwater remediation, and on-going and future business plans for the Park. Different planning and tracking tools are needed to support closures at active facilities. To support some large Airport redevelopment efforts, we created tools that allowed the Airline leaseholder to perform environmental remediation on the same schedule as building D&D and new building construction, which in turn allowed them to migrate real estate from unusable to useable within an aggressive schedule.
机译:与Rocky Flats和Fernald的最终关闭项目不同,能源部未来的CERCLA和RCRA关闭挑战将在许多活动场所进行,例如橡树岭国家实验室(ORNL)中央园区。 ORNL为研究技术园区制定了激进的增长计划,清理工作必须解决和整合D&D,土壤和地下水修复以及该园区正在进行的和未来的业务计划。需要不同的计划和跟踪工具来支持活动设施的关闭。为了支持一些大型的机场重建工作,我们创建了一些工具,使航空公司的租约持有人能够按照与建筑物D&D和新建筑物建造相同的时间表执行环境修复,从而使他们能够在激进的时间表内将房地产从无法使用迁移到可用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号