首页> 外文会议>Waste management symposium >LICENSING A HIGH LEVEL RADIOACTIVE WASTE REPOSITORY–THE PATH FORWARD
【24h】

LICENSING A HIGH LEVEL RADIOACTIVE WASTE REPOSITORY–THE PATH FORWARD

机译:许可高级放射性废物库 - 前进的道路

获取原文
获取外文期刊封面目录资料

摘要

With the formal designation in July 2002 of Yucca Mountain as the site for disposal,the nuclear waste disposal program moved into the licensing phase of the development process.DOE will enter into the licensing process defined by the NRC at 10 CFR Part 2,Subpart J,with the initial certification that documentary material has been made available to the NRC’s Licensing Support Network(LSN).The license application that DOE submits to the NRC will contain those general arrangement drawings and high-level system descriptions necessary to show that the design and the accompanying safety analysis will meet regulatory requirements.If DOE receives a construction authorization from the NRC,DOE would begin developing the facilities needed for initial operations.Simultaneously,DOE would complete enhancements to its technical and regulatory bases in anticipation of updating the application for a license to receive and possess waste.By continuing the development of its repository design and demonstrating the validity of its models of long-term waste isolation,DOE will be ready to begin safely constructing a repository upon receipt of the NRC’s construction authorization and begin safe operations a few years later following NRC’s issuance of a license.
机译:随着尤卡卡山2002年7月的正式指定作为处置的现场,核废物处理方案迁入了发展过程的许可阶段.DOE将进入NRC在10 CFR第2部分,Subpart J中定义的许可进程。如果初始证明,文件材料已提供给NRC的许可支持网络(LSN)。DOE提交给NRC的许可证申请将包含这些普通安排和高级系统描述,以表明设计和设计随附的安全分析将符合监管要求。如果DOE从NRC接收建筑授权,DOE将开始开发初始运营所需的设施。如此,DOE将在预期更新申请时完成对其技术和监管基础的改进。接收和拥有废物的许可证。继续开发其存储库设计和演示Ting其长期废物隔离模型的有效性,DOE将在收到NRC的建筑授权后,在NRC发布许可证后几年后开始安全操作,开始安全地构建储存库。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号