When the project absolutely must get done: marrying the organization chart with the precedence diagram

机译:当项目绝对必须完成时:用优先纲要结婚

获取原文

摘要

Very little is new in project planning, but this is! We present a technique to marry the organization chart with a project's task precedence diagram. This permits us to simulate the project at a micro, project-specific level never before achieved. We can perform "what-if" scenarios related to organization structures, the deployment of specific individuals and skills, and the structure of information flow and exception-handling in a project. The tool used, ViteProject, was developed over the last ten years in a Stanford University laboratory, where substantial results have been achieved when applied to design activities other than software. We present our real-world experience with several software projects, where it has improved project visibility and allowed us to rationally optimize projects in a way hitherto impossible.
机译:项目规划很少是新的,但这是!我们提出了一种用项目的任务优先级图与组织图表嫁给组织结构图。这允许我们在达到的微型项目,项目特定水平上模拟项目。我们可以执行与组织结构相关的“什么”方案,组织结构的部署,以及项目中信息流的结构和信息流的结构。使用的工具ViteProject在过去十年中开发的,在斯坦福大学实验室,在应用于软件以外的设计活动时已经实现了大量成果。我们介绍了我们的现实世界经验,有几个软件项目,在那里它具有改进的项目能见度,并使我们能够以迄今为止不可能的方式合理优化项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号