首页> 外文会议>Annual conference on explosives and blasting technique >SEISMIC MONITORING DURING BLASTINGS OF BUILDING PIT FOR WTC AT RIJEKA
【24h】

SEISMIC MONITORING DURING BLASTINGS OF BUILDING PIT FOR WTC AT RIJEKA

机译:里耶卡WTC建筑基坑爆破过程中的地震监测

获取原文

摘要

Excavating the building pit for the World Trade Center at Rijeka, it was necessary to blast over 160000 m~3 of hard mass in fused condition. The building pit is located at a densely populated residential part of the main Croatian port Rijeka, close to the railway-track and traffic routes of the town. The permanent seismic monitoring points are foreseen on endangered housing and infrastructure facilities around the pit during designing and excavation of it. The seismic monitoring has been performed on 15 permanent points by occasion of over a hundred production and continuous blasting operations. The article considers the speeds of ground oscillations depending on applied maximum quantities of explosive charge according to fire degree, total quantities of explosives at the mine-field, structure of explosive charge, applied delay of mine boring and lines initiation mode and rock mass structure
机译:开挖里耶卡世界贸易中心的建筑坑时,有必要在熔融状态下爆破超过160000 m〜3的硬质物质。建筑坑位于克罗地亚主要港口里耶卡(Rijeka)人口密集的居民区,靠近镇上的铁路和交通路线。在坑的设计和开挖过程中,将在坑周围的濒危房屋和基础设施上预见到永久性的地震监测点。通过数百次生产和连续爆破操作,在15个永久点上进行了地震监测。本文根据火势,矿场爆炸物总量,炸药结构,矿井钻进和延期施加方式的延迟以及岩体结构的不同,根据爆炸物施加的最大炸药量来考虑地面振荡的速度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号