摘要

A group of twelve TSOs in Central and Eastern Europe have set up the TSO Security Cooperation (TSC) with a permanent TSO Security Panel, new video based cooperation tools for Control Centres and a common IT platform for data exchange (CTDS) performing joint N-1 security assessments. TSC's main goal is to ensure the overall system security of a large supranational region of the European network. All participating TSOs have the same view of the grid of the whole TSC region. Depending on the nature and the location of identified problems, the involved TSO(s) are jointly proposing solutions. Proposed or requested remedial actions are based on technical and economic analysis. A coordinated decision can be made jointly amongst the TSOs during the day-by-day conference call in the evening (DOPT) where TSOs whose grid might be affected by a remedial action have the opportunity to discuss any unintended side effects and alternatives that may be considered in order to resolve the congestion. In June 2012, TSC TSOs have started an operational trial phase on Multilateral Remedial Actions (MRAs). Following discussions with representatives of the relevant National Regulatory Authorities (NRAs) of the TSC region, cost recovery for activation of selected types of MRAs was approved on a temporary basis. The MRA procedure shall help the operational planners to propose multilateral remedial actions to resolve security violations when all other available single or bilateral remedial actions are already exhausted. TSC operational planners may now order redispatch capacities from all TSC members and not only from neighbouring TSOs as is standard in other regions. Based on the experiences on MRAs during the Trial Phase, the successful implementation of MRA operational procedures shall be further optimized and an enduring solution for cost sharing shall be developed and implemented consequently. The experiences gained in the TSC region will provide significant input for the work of ACER and ENTSO-E to identify an appropriate regulatory framework for cross-border redispatch including cost-sharing arrangements. At the end of 2012, the TSC TSOs have decided to implement a new Central Service Providing Entity (CSPE) in order to increase the efficiency, quality, coordination and a faster realisation of new tasks and TSOs' common services. The decentralised approach of TSC will not be altered by the implementation of this new entity but undoubtedly supported by various supportive services. From experience, the results of security assessment have been heavily depending on the data quality of the input data. Therefore CSPE shall establish common quality assessment and supervision processes which shall be available 24/7. CSPE will also be responsible for proposing improvements regarding data quality, adaption of data models and exception handling. CSPE and TSO bodies, like the Security Panel of Expert, will work hand in hand when developing new processes, e.g. operational planning, MRAs, capacity calculation or crisis coordination. Further on, CSPE shall become a facilitator for knowledge sharing (operational planning) and training of operators (planning and real-time operation) for TSC TSOs and partners providing learning content, trainers and facilities. As preliminary measures for the envisaged additional coordination, three so-called Cooperation Areas were established within TSC developing implementation concepts for Common Medium and Long-term Outage Planning (CA I), a D-2 Common Grid Model (CA II) and a Joint Training and Certification Program (CA III). All TSC activities follow an open approach addressing TSC and general TSO issues at the same time. TSC is open for additional TSOs which are interested to cooperate in the process of implementing an efficient, effective and secure system operation. The paper outlines the recent experiences of the cooperation of the TSOs in the TSC. In addition to the technical aspects the economic and regulatory aspects
机译:A组在中欧和东欧的12个TSOS已经设置了TSO安全合作(TSC)具有永久TSO安全小组,为控制中心和数据交换的通用IT平台的新的基于视频的合作工具(CTDS)执行联合N- 1次安全评估。 TSC的主要目标是确保欧洲网络的大型超国家区域整体系统的安全性。所有参与TSOS拥有整个TSC区域的网格相同的观点。根据性质和发现问题的地点,所涉及的TSO(S)共同提出解决方案。建议或要求的补救措施是基于技术经济分析。一个协调的决定,可以在晚上一天按一天电话会议(DOPT)其中TSOS其格可能被采取补救措施的影响有机会讨论任何意想不到的副作用和替代,可能是期间共同完成的TSOS之中为了解决拥塞考虑。在2012年6月,TSC TSOS已经开始在多边补救措施(互认协议)的运行试验阶段。在与TSC地区有关国家监管部门(驻地机构)的代表进行了讨论,对所选类型的相互承认协议的启动成本回收被批准在临时基础上。该MRA程序应帮助业务规划者提出多边补救措施来解决安全违规行为时,所有其他可用单或双侧补救措施已经用尽。 TSC操作规划者可以从所有TSC成员现在顺序重调度能力和不仅来自相邻TSOS如在其他区域的标准。基于试验阶段期间的相互承认协议的经验,成功实施的MRA操作程序应进一步优化和成本分担的持久解决办法,应制定和实施结果。在TSC地区取得的经验将用于宏碁和ENTSO-E的工作,以确定跨境再发运适当的监管框架,包括费用分担安排提供显著输入。在2012年底,TSC TSOS已决定实施新的中央服务,以提高效率,质量,协调性和更快的实现新的任务和TSOS'共同服务提供实体(CSPE)。 TSC的分散方法不会受到这个新实体的实施而改变,但通过各种支持性服务无疑支持。从以往的经验,安全评估的结果已经严重依赖于输入数据的数据质量。因此CSPE应当建立其应提供24/7常见质量评价和监督的过程。 CSPE也将负责提出关于数据质量,数据模型和异常处理的适应性改进。 CSPE和TSO机构一样,专家的安全小组,将携手开发新工艺时,例如运营规划,相互承认协议,计算能力或危机的协调。另外对,氯磺化聚乙烯应成为知识共享(运行规划)和运营商(规划和实时操作)培训TSC TSOS和合作伙伴提供学习内容,培训人员和设施的促进者。作为初步措施,预计更多的协调,三个所谓的合作领域进行了内TSC建立开发普通的中和长期的停电计划(CA I),实现概念的d-2通用网格模型(CA II)和联合培训和认证计划(CA III)。所有TSC活动遵循公开方式处理TSC和左宗棠的问题在同一时间。 TSC是开放,以供有兴趣实施一个高效,有效和安全的系统运行过程中进行合作的其他TSOS。本文概述近期TSOS在TSC合作的经验。除了技术方面的经济和监管方面

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号