首页> 外文会议> >Duration/Cost Trade-offs in Project Scheduling with Time-switch Constraints
【24h】

Duration/Cost Trade-offs in Project Scheduling with Time-switch Constraints

机译:具有时间切换约束的项目计划中的工期/成本权衡

获取原文

摘要

The time-switch constraints attract less attention in the discrete time/cost trade-off problems (DTCTP, for short), but these constraints impose specific starting time on the project activities and force them to be active and inactive during specific time periods. Therefore, a more realistic optimization model is set up in this paper, which is the discrete duration/cost trade-offs in project scheduling with time-switch constraints (DDCTPTSC, for short), and then solve the DDCTPTSC by a customization heuristic genetic algorithm. Combining a real-life project example, the analysis results show that time-switch constraints'' impacts on project indirect cost, penalty cost and bonus cost are mostly different from the traditional DTCTP model because of time-switch constraints, moreover, from the viewpoints of both contractors and clients respectively, we discuss that the penalty/bonus intensity makes the effects on both deciding behaviors, the obtained conclusions provide the instructive meaning for them in the project''s negotiation
机译:时间切换约束在离散的时间/成本权衡问题(简称DTCTP)中吸引的关注较少,但是这些约束将特定的开始时间强加到项目活动上,并迫使它们在特定时间段内处于活动状态和非活动状态。因此,本文建立了一个更切合实际的优化模型,即具有时间切换约束的项目调度中离散的工期/成本折衷(简称DDCTPTSC),然后通过定制启发式遗传算法求解DDCTPTSC。 。结合一个实际的项目实例,分析结果表明,由于时间转换的限制,时间转换的限制对项目间接成本,罚款成本和奖金成本的影响与传统的DTCTP模型大不相同。我们分别讨论了承包商和客户的惩罚/奖金强度对决定行为都有影响,得出的结论对他们在项目谈判中具有指导意义

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号