首页> 外文会议> >Study on the DC transmission scheme of Xiluodu and Xiangjiaba Hydropower Stations
【24h】

Study on the DC transmission scheme of Xiluodu and Xiangjiaba Hydropower Stations

机译:溪洛渡和向家坝水电站直流输电方案研究。

获取原文

摘要

The main problems associated with the DC transmission scheme of Xiluodu and Xiangjiaba Hydropower Stations are studied. Some problems in the simulation of large-scale AC/DC power systems are discussed, including the applicability of the quasi-steady state model of the HVDC system and the factors causing HVDC converter commutation failure. For the two receiving end systems and one sending end system of the DC transmission scheme for Xiluodu and Xiangjiaba Hydropower Stations, the transient stability of each system is analyzed under various AC and DC disturbances with different stability improving control strategies. The results show the DC transmission scheme for Xiluodu and Xiangjiaba Hydropower Stations is technically sound.
机译:研究了溪洛渡和向家坝水电站直流输电方案的主要问题。讨论了大型AC / DC电力系统仿真中的一些问题,包括HVDC系统的准稳态模型的适用性以及导致HVDC换流器换向失败的因素。对于溪洛渡和向家坝水电站直流输电方案的两个接收端系统和一个发送端系统,分析了在各种交流和直流干扰下采用不同稳定性改善控制策略的每个系统的暂态稳定性。结果表明,溪洛渡和向家坝水电站的直流输电方案在技术上是合理的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号