首页> 外文会议>Mathematical models and methods in applied sciences >Analysis of the critical path within a project with WinQSB software
【24h】

Analysis of the critical path within a project with WinQSB software

机译:使用WinQSB软件分析项目中的关键路径

获取原文
获取原文并翻译 | 示例

摘要

This article presents the critical path method, stages of realization, the advantages and disadvantages of using it in a project. Critical path, consisting of some project activities, represents the longest path (as duration) of the project and any delay that occurs on this route will lead to project delay. The case study presents a real situation of a furniture manufacturing company that wish to expand their opportunities for sale, on the internet. The project must be implemented in a shortest time and with a lower cost, therefore, the analysis of critical path was done using PERT/CPM module, of the WINQSB decision analysis software.
机译:本文介绍了关键路径方法,实现的阶段,在项目中使用它的优缺点。关键路径(由某些项目活动组成)表示项目的最长路径(持续时间),在此路径上发生的任何延迟都将导致项目延迟。该案例研究提出了一家家具制造公司的实际情况,该公司希望通过互联网扩大销售机会。该项目必须在最短的时间内以较低的成本实施,因此,关键路径的分析是使用WINQSB决策分析软件的PERT / CPM模块完成的。

著录项

  • 来源
  • 会议地点 Iasi(RO);Iasi(RO)
  • 作者单位

    Faculty of Engineering and Technological Systems Management, Faculty of Mechanical Engineering University "Polytechnic" of Bucharest, University "Ovidius" of Constanta Splaiul Independentei Street, No. 313, Bucharest,Mamaia Street, No. 124, Constanta ROMANIA;

    Faculty of Engineering and Technological Systems Management, Faculty of Mechanical Engineering University "Polytechnic" of Bucharest, University "Ovidius" of Constanta Splaiul Independentei Street, No. 313, Bucharest,Mamaia Street, No. 124, Constanta ROMANIA;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    project; critical path; graph; decision analysis; PERT/CPM; WinQSB software;

    机译:项目;关键路径;图形;决策分析; PERT / CPM; WinQSB软件;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号