Key Chain Buffer Setting Method for Uncertainty of Project Duration

机译:项目工期不确定的钥匙链缓冲区设置方法

获取原文
获取原文并翻译 | 示例

摘要

Project duration uncertainty has become a problem of project progress analysis. In particular, the duration of some project processes is in a very large range. In order to solve this problem, this article measures the uncertainty coefficient of the process based on the entropy method and calculates the definite duration of the project process. Then, this article introduces the project risk coefficient red line, based on the relative risk coefficient to establish the key chain buffer and non-key chain buffer setting model, setting the project buffer to calculate its duration. Combined with the example and compared with the shear-paste method, it proves that this method is more scientific, reasonable, and effective.
机译:项目工期的不确定性已成为项目进度分析的问题。特别是,某些项目过程的持续时间在很大范围内。为了解决这一问题,本文采用熵值法对过程的不确定性系数进行了度量,并计算了项目过程的确定工期。然后,本文介绍了项目风险系数红线,根据相对风险系数建立了钥匙链缓冲区和非钥匙链缓冲区设置模型,设置了项目缓冲区以计算其持续时间。结合实例,与剪切-粘贴法进行比较,证明了该方法更加科学,合理,有效。

著录项

  • 来源
  • 会议地点 Nanjing(CN)
  • 作者

    Fenglin Zhang; Xingming Gao;

  • 作者单位

    College of Economics and Management, Nanjing University of Aeronautics and Astronautics, 29 Jiangjun Street, Nanjing, Jiangsu 211106, People's Republic of China;

    College of Economics and Management, Nanjing University of Aeronautics and Astronautics, 29 Jiangjun Street, Nanjing, Jiangsu 211106, People's Republic of China;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Progress analysis; Entropy weight method; Buffer; Uncertainty;

    机译:进度分析;熵权法;缓冲;不确定;