首页> 外文会议>International Symposium on Water Resources and the Urban Environment; 20031109-10; Wuhan(CN) >Finite Element Calculation for Large Foundation Pit Dewatering in Double-layered Aquifer Structural Foundation
【24h】

Finite Element Calculation for Large Foundation Pit Dewatering in Double-layered Aquifer Structural Foundation

机译:双层含水层结构地基中大型基坑降水的有限元计算

获取原文
获取原文并翻译 | 示例

摘要

For dewatering project based on multi-layered aquifer foundation which there are hydraulic relations between upper aquifer and conjoint nether one, it will influence another dynamic change of adjacent aquifer water level when dewatering in a aquifer. It is very difficult to resolve this problem according to general three-dimensional numerical method as a result of their different groundwater constitutional equation. Dewatering in phreatic water layer where there is a conjoint nether confined aquifer will increase water head difference between the two aquifers and increase leakage. The paper analyses the leakage phenomenon in east experimental field of Xuanwu Lake tunnel, predict FEM equation of foundation pit dewatering for double-layered aquifer and has a conclusion that it will be a stable phreatic water level in foundation pit when dewatering and setting up full-scale impervious curtain.
机译:对于基于多层含水层基础的脱水工程而言,上层含水层与联合含水层之间存在水力关系,在含水层脱水时会影响相邻含水层水位的另一动态变化。由于地下水构造方程不同,根据一般的三维数值方法很难解决这个问题。在有相连的下承压含水层的潜水水层中脱水,将增加两个含水层之间的水头差,并增加泄漏。本文分析了玄武湖隧道东侧试验场的渗漏现象,预测了双层含水层基坑降水的有限元方程,得出的结论是,脱水和全程设置后,基坑的潜水水位将保持稳定。规模不透水的窗帘。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号