【24h】

BOSTON CENTRAL ARTERY/TUNNEL PROJECT: INNOVATIVE USE OF PRECAST SEGMENTAL TECHNOLOGY

机译:波士顿中央动脉/隧道项目:前段技术的创新应用

获取原文
获取原文并翻译 | 示例

摘要

Boston's Central Artery/Tunnel Project is the largest infrastructure undertaking ever attempted at a single US location. It involves reconstructing Interstate Highway 93 (I-93) by depressing it into a tunnel and subsequently removing the original elevated highway (known as the Central Artery). The new I-93 will emerge from the tunnel near the south bank of the Charles River and rise to cross the river on a cable-stayed bridge. This structure, unique in the world, will be both longitudinally and transversely asymmetrical. The second phase of the project extends the Massachusetts Turnpike (I-90) through South Boston and under Boston Harbour to Logan International Airport. This paper reports on the innovative aspects of the project's segmental concrete interchanges, which resulted in superior quality and constructibility.
机译:波士顿的中央动脉/隧道项目是有史以来在美国单一地点进行的最大规模的基础设施建设。它涉及通过将93号州际公路(I-93)压入隧道,然后拆除原来的高架公路(称为中央动脉)来重建。新的I-93将从查尔斯河南岸附近的隧道中出来,并通过斜拉桥越过河。这种结构在世界上是独一无二的,在纵向和横向上都是不对称的。该项目的第二阶段将马萨诸塞州收费公路(I-90)延伸至南波士顿,并在波士顿港之下延伸至洛根国际机场。本文报告了该项目分段混凝土互换的创新方面,从而带来了卓越的质量和可施工性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号