IMPROVING THE OPERATING TECHNICAL SPECIFICATIONS IN FRENCH PWR POWER PLANTS

机译:改善法国压水堆电厂的运行技术规格

获取原文
获取原文并翻译 | 示例

摘要

Both Electricite de France (EDF) and French Safety Authorities wanted to clarify the nuclear safety demands during unit operation, laid down, in particular, in the General Operating Rules. As a result, a policy for improving the operating technical specifications (OTS) was defined. The objectives of improving the OTS are to simplify, to lighten if possible, to explain, to clarify and to complete, if necessary, the standard document of the OTS used by plant operators. These objectives are reached by improving the technical content and the form of the OTS document. A three-stage action plan has been drawn up: to restructure the OTS (mainly their form), to clarify the OTS policy and to improve the technical context of the OTS on the basis of the new structure and the new policy. The first stage of the action plan is nearly complete; a standard restructured document for the PWR 1300 MW series was put into application in 1995; the equivalent document for the PWR 900 MW series was submitted to the Safety Authorities at the end of 1995. The second stage of the plan will also be completed in 1996. The method for restructuring was based on feedback experience: analysis of significant operating event reports, waiver requests, international feedback and recent safety studies. After more than one year of experience on all PWR 1300 MW sites, it appears that the new OTS are widely considered to be a vector of safety culture. Clarification and simplification of the OTS enable plant operators to achieve a better quality of safety analysis and better unit safety conditions.
机译:法国电力公司(EDF)和法国安全机构都希望澄清机组运行期间的核安全要求,尤其是在《通用运行规则》中。结果,制定了改善操作技术规范(OTS)的政策。改进OTS的目的是简化,简化(如果可能的话),解释,澄清并在必要时完成工厂运营商使用的OTS标准文件。通过改进OTS文档的技术内容和形式可以实现这些目标。已经制定了一个三阶段的行动计划:在新结构和新政策的基础上,重组OTS(主要是其形式),阐明OTS政策并改善OTS的技术环境。行动计划的第一阶段已接近完成; PWR 1300 MW系列的标准重组文件于1995年投入使用; PWR 900 MW系列的等效文件已于1995年底提交给安全机构。该计划的第二阶段也将于1996年完成。重组方法是基于反馈经验:对重要运行事件报告的分析,豁免要求,国际反馈和最近的安全性研究。经过在所有PWR 1300 MW场所的一年以上经验之后,看来新的OTS被广泛认为是安全文化的载体。 OTS的澄清和简化使工厂操作员可以获得更高质量的安全分析和更好的机组安全条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号