首页> 外文会议>International symposium on concrete faced rockfill dams(CFRD2000) >STUDY ON APPLICATION OF SANDY GRAVEL TO GUDONGKOU CONCRETE FACED ROCKFILL DAM
【24h】

STUDY ON APPLICATION OF SANDY GRAVEL TO GUDONGKOU CONCRETE FACED ROCKFILL DAM

机译:砂砾碎石在古洞口混凝土面板堆石坝中的应用研究

获取原文
获取原文并翻译 | 示例

摘要

Gudongkou Concrete Faced Rockfill Dam (hereinafter referred to as Gudongkou Dam), over 100m in height, is primarily filled with sandy gravel. As demonstrated by the results of the laboratory and in-situ testing analysis of sandy gravel, the definite element calculation of the dam body, and the deformation observation thereof, it is not only cost-effective but also safe and reliable to fill concrete faced rockfill dam with sandy gravel provided with proper handling process.
机译:古洞口混凝土面板堆石坝(以下简称古洞口坝),高度超过100m,主要填充有沙砾。砂砾石的实验室和现场测试分析结果,坝体的有限元计算及其变形观测结果表明,填充混凝土面板堆石不仅具有成本效益,而且安全可靠。带有沙砾的大坝,提供了适当的处理程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号