首页> 外文会议>International Conference with Exhibition Fuel Cell 2000 Jul 10-14, 2000 Lucerne, Switzerland >Two years experience with the 100 kW SOFC Cogeneration Unit at Arnhem
【24h】

Two years experience with the 100 kW SOFC Cogeneration Unit at Arnhem

机译:在阿纳姆拥有100 kW SOFC热电联产装置的两年经验

获取原文
获取原文并翻译 | 示例

摘要

Since January 1998, the 100 kWe EDB/Elsam solid oxide fuel cell cogeneration unit is in operation in Westervoort. The projects objectives of the EDB/ELSAM 100 kW SOFC demonstration can be summarized as: 1. Demonstrate the high efficiency and low emissions of the Westinghouse SOFC technology on a 100 kW_e scale 2. Gain experience on the operation and maintenance of the SOFC as a Co-generation unit. 3. Establish technical characteristics (in-/output, availlability/durablility and low emissions) of the SOFC technology. 4. Determine the technical and economical possibilities of the SOFC technology. In the first half of 1998 the unit operated at nominal power conditions for almost 3.700 hours. After a revision in the U.S., the unit started operations in March 1999, and operated for more than 8.000 hours (April 2000). The experience with the operation of the unit ans some test results wil be presented.
机译:自1998年1月以来,100 kWe EDB / Elsam固体氧化物燃料电池热电联产装置在Westervoort投入运行。 EDB / ELSAM 100 kW SOFC演示的项目目标可以概括为:1.在100 kW_e规模上证明西屋SOFC技术的高效和低排放2.在SOFC的运行和维护方面获得经验热电联产机组。 3.确定SOFC技术的技术特征(输入/输出,可用性/耐用性和低排放)。 4.确定SOFC技术的技术和经济可能性。在1998年上半年,该设备在标称功率条件下运行了将近3.700小时。在美国进行改版后,该装置于1999年3月开始运行,运行了超过8000小时(2000年4月)。将提供单元操作的经验和一些测试结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号