首页> 外文会议>International Conference on Automated Planning and Scheduling(ICAPS 2007); 2007; >Managing Personal Tasks with Time Constraints and Preferences
【24h】

Managing Personal Tasks with Time Constraints and Preferences

机译:具有时间限制和首选项的个人任务管理

获取原文
获取原文并翻译 | 示例

摘要

This paper treats the problem of managing personal tasks, through an adaptation of the Squeaky Wheel Optimization (SWO) framework, enhanced with powerful heuristics and full constraint propagation. The problem involves preemptive and non-preemptive tasks, with extra constraints imposed on the sizes of and the distances between the parts of each preemptive task. Travelling times are imposed by the alternative localization possibilities of each task. Ordering constraints are imposed by the producer-consumer relations between tasks. The user may have preferences regarding scheduling options of single tasks or pairs of tasks. Higher degree time constraints and preferences are supported as well. SWO allows for fast scheduling and rescheduling. Several heuristics are proposed to estimate the difficulty to schedule each task and to compensate with the degree of the user's satisfaction. Experimental results show that this approach is remarkably effective and efficient.
机译:本文通过改编吱吱作响的车轮优化(SWO)框架来解决管理个人任务的问题,该框架通过强大的启发式方法和完全约束传播得到了增强。问题涉及抢先任务和非抢先任务,并对每个抢先任务的大小和部分之间的距离施加了额外的约束。旅行时间取决于每个任务的替代本地化可能性。任务之间的生产者-消费者关系强加了排序约束。用户可能对单个任务或任务对的计划选项有偏好。还支持更高程度的时间限制和偏好。 SWO允许快速调度和重新调度。提出了几种启发式方法,以估计安排每个任务的难度并补偿用户的满意程度。实验结果表明,该方法非常有效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号