Interface and requirements management for the Divertor Tokamak Test facility

机译:Divertor Tokamak测试设备的界面和需求管理

获取原文

摘要

Large experimental facilities always require the development or personalization of many non-conventional systems which will constitute a relevant part of the machine. For this reason in these cases an approach based on Systems Engineering is very useful to support the design choices given the complexity of the project and the many interconnections between different systems and subsystems. The case in analysis is the Divertor Tokamak Test (DTT), a nuclear fusion facility based in ENEA C.R. Frascati, Italy. The goal of this work is to present the development of an agile tool aimed at ensuring the consistency of design choices with project requirements, propagating them through systems, subsystems and components with the associated technical specifications. Additionally, a methodology for requirements verification in the construction phase is discussed. In the presentation of the methodology implemented, the practical application to three different situations within the DTT project development is discussed.
机译:大型实验设备始终需要开发或个性化许多非常规系统,这些系统将构成机器的相关部分。因此,在这些情况下,鉴于项目的复杂性以及不同系统和子系统之间的许多互连,基于系统工程的方法对于支持设计选择非常有用。分析的案例是Divertor Tokamak测试(DTT),这是位于意大利ENEA C.R. Frascati的核聚变设施。这项工作的目的是提出一种敏捷工具,旨在确保设计选择与项目要求的一致性,并通过具有相关技术规范的系统,子系统和组件进行传播。此外,还讨论了在施工阶段进行需求验证的方法。在介绍实施的方法时,讨论了DTT项目开发中三种不同情况的实际应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号