首页> 外文会议>International IEEE Conference and Workshop in Obuda on Electrical and Power Engineering >Warming and Load Testing of Steel Ground Wires in Laboratory : Simplified Load Testing
【24h】

Warming and Load Testing of Steel Ground Wires in Laboratory : Simplified Load Testing

机译:实验室中钢绞线的保温和载荷测试:简化的载荷测试

获取原文

摘要

Among extreme weather conditions icing ist one of the main factor, that caused significant damages on several sections of transmission and distribution networks in the last few years. Especially a lot of damages (broken wires, leaning or falling of towers were caused in 2013 and 2014. First of all Ground Wires are exposed to icing. The design measuring supports the elaboratorion of possible solutions, which I personally carried out in laboratory of the Technical University of Kosice. During the measuring processes I examined the heating of different kinds of Ground Wires under current load. To measurements I choose the most commonly used Hungarian standard wires.
机译:在极端天气条件下,结冰是主要因素之一,在最近几年中,这对输配电网络的多个部分造成了重大破坏。尤其是在2013年和2014年,造成了很多损坏(断线,铁塔倾斜或掉落)。首先,地线会结冰。设计测量有助于阐述可能的解决方案,我亲自在实验室进行了研究。科希策工业大学在测量过程中,我检查了电流负载下各种接地线的发热情况,在测量中,我选择了最常用的匈牙利标准线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号