首页> 外文会议>International conference on structural engineering, mechanics and computation >Running safety assessment of a high-speed train moving over the new Volga River Bridge subjected to crosswinds
【24h】

Running safety assessment of a high-speed train moving over the new Volga River Bridge subjected to crosswinds

机译:经受侧风的高速列车越过新伏尔加河大桥的运行安全性评估

获取原文

摘要

A study regarding the safety against crosswinds of a highspeed train running over two possible solutions for a railway bridge belonging to the future high-speed railway network in Russia is presented. To achieve this, a series of dynamic train-structure interaction analysis were carried out in order to obtain the safety factors according to each scenario. The wind load is modelled based on the Chinese Hat gust scenario defined in EN 14067-6, considering a maximum gust speed of 34 m/s, which is the maximum wind speed measured in the meteorological stations located near the construction site.
机译:提出了一项针对高速列车侧风的安全性的研究,该高速列车针对属于俄罗斯未来高速铁路网的铁路桥梁,有两种可能的解决方案。为了达到这个目的,进行了一系列动态的列车-结构相互作用分析,以便获得每种情况下的安全系数。风载荷是根据EN 14067-6中定义的中国帽子阵风情景建模的,其中考虑到最大阵风速度为34 m / s,这是在施工现场附近的气象站中测得的最大风速。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号