首页> 外文会议>International conference on structural engineering, mechanics and computation >Testing and strengthening of funicular arched steel truss false-work
【24h】

Testing and strengthening of funicular arched steel truss false-work

机译:缆索拱形钢桁架虚假工作的测试和加固

获取原文

摘要

The formwork systems represents an important component of the construction industry. All the previous inventions focused on enhancing the performance of the already existing system without introducing any new structural ideas. The Funicular Arched Steel Truss (FAST) introduces new structural concept that was proved to be sound. This paper discusses the strengthening of this system to increase its capacity using an additional bracing system. The new bracing system was chosen based on some factors to avoid losing the advantages of the new system.
机译:模板系统代表了建筑行业的重要组成部分。所有先前的发明都集中于增强现有系统的性能而不引入任何新的结构思想。缆索拱形钢桁架(FAST)引入了新的结构概念,事实证明该结构是合理的。本文讨论了使用额外的支撑系统来加强此系统以增加其容量的问题。基于一些因素选择了新的支撑系统,以避免失去新系统的优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号