首页> 外文会议>International conference on structural engineering, mechanics and computation >The behavior during construction of an existing tunnel that lies between two large vertically parallel shield tunnels adjacent to each other
【24h】

The behavior during construction of an existing tunnel that lies between two large vertically parallel shield tunnels adjacent to each other

机译:位于两个相邻的垂直平行的大型屏蔽隧道之间的现有隧道在施工过程中的行为

获取原文

摘要

This paper is described about vertically parallel shield tunneling. The deformations of the existing tunnel nearby shield tunneling were measured. The authors proposed the 2D FEM with the inclusion of the self-weight of the shield machine in the simultaneous excavation of vertical parallel shielded tunnels.
机译:本文介绍了有关垂直平行盾构隧道的方法。测量了盾构隧道附近现有隧道的变形。作者提出了在同时开挖竖向平行屏蔽隧道的过程中考虑盾构机自重的二维有限元方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号