Mobilized Resistances Based on Static, Dynamic, and Numerical Methods at the Jingi Jingi Creek Bridge Replacement Project, Queensland, Australia

机译:基于静力,动力和数值方法的动员阻力,澳大利亚昆士兰州的金吉金吉克里克桥梁置换项目

获取原文

摘要

The foundations of a 17- by 10-m span bridge that were used to replace a 145-m-long culvert on the Warrego Highway, west of Brisbane, Australia, have recently been completed. The bridge foundations consisted of 5- by 550-mm octagonal prestressed concrete (PSC) piles at the abutments and pier locations. A total of 90 PSC piles were installed. Prior to installing the production piles, three test piles were driven to nominal refusal per Queensland Department of Transport and Main Roads (QDTMR) guidelines. The test piles were dynamically tested using the Pile Driving Analyzer, and the activated (mobilized) resistances and their distributions were checked against those predicted from static- and finite element-based approaches. During the installation of the production piles, representatives of the piles were equally tested per QDTMR guidelines, and all results from the various methods at different stages of the project were analyzed and compared. piling; geotechnics; environmental issues; ground improvement; soft soil engineering
机译:最近已经完成了一座17 x 10米跨距桥的基础,该桥用于替换澳大利亚布里斯班以西的Warrego高速公路上的145米长涵洞。桥基由在桥台和桥墩位置处的5 x 550毫米八角形预应力混凝土(PSC)桩组成。总共安装了90个PSC桩。在安装生产桩之前,根据昆士兰州运输和干道部(QDTMR)指南,将三根测试桩打入标称拒绝状态。使用打桩分析仪对测试桩进行了动态测试,并根据基于静态和有限元方法的预测值来检查激活的(移动的)阻力及其分布。在安装生产桩的过程中,按照QDTMR指南对桩的代表进行了相同的测试,并对项目不同阶段采用各种方法得出的所有结果进行了分析和比较。桩;岩土工程;环境问题;地面改善;软土工程

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号