Optimization Research on Overall Test Strategy of Operational DCS in Nuclear Power Plant

机译:核电厂运行DCS总体测试策略的优化研究

获取原文

摘要

This paper studies the optimization measures based on the operational DCS test strategy widely used in the second generation Nuclear Power Plant (NPP), to meet the more complex operational DCS test demands for the third generation NPP. The operational DCS is the monitoring and control center of equipment in NPP. As the third generation NPP is becoming the mainstream technology, the test activity of operational DCS is meeting with many new challenges like higher test complexity and longer test period, which lead to the situation that the test strategy currently used in the second generation NPP cannot meet the test demands of the third generation NPP. The test strategy currently used needs optimizing as early as possible. This paper firstly analyzes the current situation of the operational DCS test strategy used in second generation NPP and the existing shortfalls. Secondly, the paper analyzes the overall test strategy used in EPR NPP which is a third generation NPP. After that, these two kinds of test strategy are compared in four aspects leading to the conclusion that the EPR overall test strategy has obvious advantages in many aspects and is more applicable for complex DCS systems in third generation NPP. Moreover, the paper also presents that there are still some problems existing in EPR test strategy and suggests corresponding solutions for these problems. At last, the paper proposes a series of optimization suggestions on overall test strategy for operational DCS systems in the new-built third generation NPPs.
机译:本文基于第二代核电厂(NPP)广泛使用的运行DCS测试策略研究优化措施,以满足第三代NPP更加复杂的DCS运行测试需求。运行中的DCS是NPP中设备的监视和控制中心。随着第三代NPP成为主流技术,可操作DCS的测试活动面临着许多新挑战,例如更高的测试复杂性和更长的测试时间,导致当前第二代NPP使用的测试策略无法满足的情况第三代核电厂的测试要求。当前使用的测试策略需要尽早优化。本文首先分析了第二代核电厂运行DCS测试策略的现状以及存在的不足。其次,本文分析了EPR NPP(第三代NPP)中使用的总体测试策略。之后,从四个方面对这两种测试策略进行了比较,得出的结论是,EPR整体测试策略在很多方面都有明显的优势,并且更适用于第三代核电厂的复杂DCS系统。此外,本文还提出了EPR测试策略中仍然存在一些问题,并针对这些问题提出了相应的解决方案。最后,针对新型第三代核电厂运行DCS系统的整体测试策略提出了一系列优化建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号